Dukes Home Page Future Renovation
Home Page
This is where all the work that has been identified as required is to be found. Time / Money prevents this being undertaken at present but will be done eventually (almost a wish list I suppose)

Select Area:-
1. Front Beam removal & Renovation
2. Engine removal
3. Winscreen Repair
4. Replace Window Seals
5. Renovate Fuel Tank & Bay


Front Beam

It is intented to remove the front beam to allow the final repairs to be made to the chassis parts. Once removed the upper and lower suspension ball joints require replacing along with a general overhaul and refurbishment of the rest of the beam


Engine

The engine is running fine at present but will need removing in oreder to complete the fuel tank repairs. Whilst it is out the heat exchangers want refitting to the heads(broken studs) and a few minor oil leaks require attention.


Windscreen

As with a lot of bays, the winscreen surround has corrosion. This at present is not a major issue but has been noted as work required.


Window Seals

All window seals would benefit from being renewed but I will try and resist this until the bus has been resprayed.


Fuel Tank

There is a smell of petrol upon filling the tank so it needs to be addressed. Removal of the tank and inspection of all the joining pipes should fix this problem. Usually the breather pipes are guilty of creating this smell.


Other Areas:
1. Front Beam removal & Renovation
2. Engine removal
3. Winscreen Repair
4. Replace Window Seals
5. Renovate Fuel Tank & Bay
Valid HTML 4.0! Valid HTML CSS!